Projects

Structural Design Verification for the Mandurah Traffic Bridge Replacement

Project Date: April 2016
Client: Main Roads WA / KBR
Project Type: Design Verification
Location: Mandurah, WA
Categories: Civil Infrastructure, Specialist Analysis
Project Description:

Design and Analysis provided independent detailed analysis of construction staging for the incrementally launched bridge technique for the 250m-long structure across the Mandurah Estuary.

Project Scope:
  • Independent structural verification for construction staging
  • Independent calculations to proof structural design of bridge super structure and substructure
  • Verification against SWTC and Australian Standard Requirements
  • Independent calculations and verification of the fishing platforms.
Outcome:

The new Mandurah Traffic Bridge was fully opened to traffic in December 2017. It includes a 5m-wide shared path separated from the main bridge and fishing platforms and boardwalks accessible from the eastern and western foreshores.