
Fiona Stanley Hospital Car Park
- Client
- Georgiou
- Location
- Murdoch, WA
- Sector
- Civil
Project overview
D&A was engaged by Georgiou to provide comprehensive Independent Verification (IV) and Construction Phase Support (CPS) services for the Fiona Stanley Hospital Western Car Park development in Perth. This major infrastructure project required multi-disciplinary verification to ensure full compliance with the Statement of Work Technical Criteria (SWTC) and relevant Australian Standards. D&A’s IV scope encompassed structural, geotechnical, architectural, drainage, electrical, mechanical, ICT, hydraulic, fire safety, vertical transportation, and universal access disciplines.
As a Level 2 Comprehensive Certifier and Level 3 Proof Engineer, D&A undertook detailed verification of design reports, drawings, BIM models, and interface coordination across all disciplines. The verification process included compliance checks, constructability reviews, and design integrity assessments, culminating in the issue of formal Verifier’s Statements for IFC submission.
In addition to design verification, D&A provided ongoing Construction Phase Support, assisting Georgiou and the design team with technical queries during construction. This included expert review and advice on concrete mix designs, material specifications, structural detailing clarifications, and site-based technical coordination. D&A’s involvement ensured that the design intent was fully realised on-site while maintaining compliance, safety, and performance standards.
Gallery