
Specialist Analysis
Structural Design Verification, Mandurah Traffic Bridge Replacement
- Client
- Main Roads WA / KBR
- Location
- Mandurah, WA
- Timeframe
- April 2016
- Service
- Specialist Analysis
- Sector
- Bridges
Project overview
Design and Analysis provided independent detailed analysis of construction staging for the incrementally launched bridge technique for the 250m-long structure across the Mandurah Estuary.
Gallery