(08) 6118 4550
Mandurah traffic bridge replacement works
Specialist Analysis

Structural Design Verification, Mandurah Traffic Bridge Replacement

Main Roads WA / KBR, Mandurah, WA

Client
Main Roads WA / KBR
Location
Mandurah, WA
Timeframe
April 2016
Service
Specialist Analysis
Sector
Bridges

Project overview

Design and Analysis provided independent detailed analysis of construction staging for the incrementally launched bridge technique for the 250m-long structure across the Mandurah Estuary.

Have a similar project?